As Location Manager at TopHat Logistical Solutions running the Indianapolis Costco delivery operation, I inherited a location stuck around 94.7% In-Window, below Costco's 96% target, even though completion was already solid at about 97.2%. Route changes during morning loadout were common, sometimes as many as 40 in a single day, and problems like survey scores, claims, and service failures tended to surface only after the reporting period had already closed, by which point there was nothing left to do but explain them.
I built a 60" x 40" visual board I called the Daily Loadout Command Center, placed where the whole team saw it every morning, with fixed sections for Daily Loadout, KPI Metrics, Priority Alerts, Route-Specific Intel, and Driver Check-Ins. At our 6:30 AM stand-up, before loadout started around 6:40, I reviewed the prior day's In-Window %, completion %, survey scores, and any damage or claims issues, and flagged anything needing correction before trucks left the building. The board tracked route assignments, driver check-ins, and problem stops, and I layered in weekly, month-to-date, period-to-date, and year-to-date views so contractors could see trends instead of one bad day in isolation. I also folded Costco compliance items into the same routine: uniform checks, safety reminders, badges, delivery-team photos, and survey-card distribution. That let me coach contractors with specifics instead of generalities, pointing to the exact route, survey, or service failure pulling their numbers down rather than just saying a team "needed to do better."
Pre-assigning routes and tightening morning controls also cut down the chaos at loadout. Mornings that used to see dozens of last-minute route changes turned into stretches with almost none, which meant teams got out the door on time instead of losing the morning to confusion.
Over the following two to three months, In-Window performance moved from below Costco's 96% standard to periods meeting or exceeding it, including a week at roughly 97% In-Window and 97.8% completion, with survey scores around 4.6 out of 5. The operation became far more predictable day to day, with contractors adjusting their behavior because they knew the numbers were reviewed every morning and followed by real coaching.